Quincy: Condo rebuilt after water damage along the window wall

Water damage · Insurance claim

Project

Quincy: a stalled water damage job finished, from the subfloor up

This Quincy condo came to us with the flooring already pulled and a section of subfloor along the window wall opened by a previous crew, then left. Water had gotten in along the exterior wall under the windows and the subfloor in that strip was stained and soft. We documented and metered the unit, cut out the damaged subfloor, dried and treated the framing, repaired the drywall at the base of the walls, and then rebuilt the unit as one job: new wood-look plank flooring through the living room, hallway, and bedroom, new baseboard and casing, and fresh paint throughout. Finished in November.

After: the living room with new plank flooring, new baseboard, and fresh paint in a Quincy condo
After: living room, new floors and trim
Before: old flooring pulled up and stacked in the living room of a Quincy condo after water damage
Before: flooring pulled, walls stained along the window wall
Before: subfloor opened along the window wall by a previous crew, stained black from water
Before: the opened subfloor along the window wall
After: new plank flooring and trim carried into the next room of the Quincy condo
After: new floor and trim carried into the next room
In progress: new plank flooring going down in the Quincy condo living room
In progress: new flooring going down
In progress: new flooring meeting the kitchen tile with the transition being set
In progress: transition at the kitchen tile
After: new baseboard and door casing against the new plank floor
After: new baseboard and casing
The askFinish a water damage repair that another crew had started and stopped, make sure the subfloor along the window wall was actually fixed, and give the owner back a unit that looked like one job, not two.
What we didDocumented and metered the unit, removed the remaining damaged flooring and the stained subfloor along the exterior wall, treated and dried the framing, installed new subfloor, repaired the drywall at the base of the walls, laid new plank flooring through the living room, hall, and bedroom with a transition at the kitchen tile, and finished with new baseboard, casing, and paint.
Why it mattersNew flooring over a wet subfloor hides the problem for about a year. Cutting out the bad section along the window wall and drying the framing before the floor went down is the part of this job the owner will never see, and the reason the stain is not coming back.

Have a water damage job that stalled, or one that has not started?