A leak in a rental unit is two problems at once: the repair and the tenant. Get the second one wrong and the first one gets expensive. Here is the timeline landlords around Boston should expect, what Massachusetts expects of you, and the message to send in the first hour.
Day one: the call and the message
Stop the water, call us, and tell the tenant what is happening before they have to ask. Something like: "We have a water leak affecting your unit. A restoration crew is coming today to dry it out. I will update you tonight on what we found and what the schedule looks like." Short, specific, and sent in writing. Tenants who hear from you first stay patient. Tenants who hear nothing call the board of health.
What Massachusetts expects
The state sanitary code requires rental housing to be free of standing water, chronic dampness, and mold, and to have working heat, hot water, and electricity. A unit with a wet floor and drying equipment running is usually fine to occupy; a unit with no bathroom, no kitchen, or mold in the living space is not. If the tenant cannot use the unit, the rent for that period is on the table, and many landlords handle it as a proportional credit rather than wait for the tenant to withhold it. Your own insurance may cover lost rent; ask the adjuster on the first call.
Timeline for a typical unit loss
- Days 1 to 4: extraction and drying. Equipment runs in the affected rooms. Tenant usually stays, with noise and access to work around.
- Days 3 to 14: scope and carrier approval. Nothing visible happens in the unit, which is the part that frustrates tenants. Tell them this is the insurance step and give them a date to expect an update.
- Weeks 2 to 4: rebuild. Drywall, paint, flooring. A bathroom or kitchen adds time for cabinets and tile. We schedule around the tenant's work hours where we can and leave the unit clean every night.
Where it goes wrong
Three ways, every time. The landlord waits a few days to see if it dries on its own, and it turns into mold. The mitigation company and the rebuild contractor are two different outfits, and the handoff adds two weeks of silence. Or nobody tells the tenant anything, and the first the landlord hears of a problem is a letter from the city. One contractor for the whole job, and one message a day to the tenant, prevents all three.
For property managers
We work with managers across Quincy, Dorchester, and the South Shore on exactly this: a single point of contact, photos and updates you can forward to the owner, a COI on file, and billing that matches the claim. If you manage more than a few doors, it is worth having the number before you need it.
Call (617) 642-2617. We are on site the same day, and we will give you the update to send your tenant tonight.
Call (617) 642-2617